During calendar year 2007, Union Pacific plans to install C.T.C. along The Overland Route all across Iowa.
1st QUESTION: Along with the C.T.C. is Union Pacific installing wayside block signals, both intermediates and controlled signals?
2nd QUESTION: As segments of C.T.C. are cut over, is the C.& N.W. Automatic Train Control system being retired?
3rd QUESTION: Is Union Pacific installing its Coded Cab Signal system to supplement the new C.T.C. installation?
4th QUESTION: There probably are some places where the Iowa east-west mainline encounters a railroad crossing at grade. Along with extending C.T.C. is U.P. also replacing any automatic interlockings with manual interlockings under the control of the Harriman Dispatching Center?