Once again the old PRR CAT has failed between WASH - BAL. All MARC was cancelled this morning. It is a wonder whether the PRR CAT will survive until the CAT is replaced by constant tension cat.
Can’t they just give the engineer a ladder and insulated pliers so he could climb up and twist the wires back together?