Code 100 bridge track

If you went up MD 30 into Hanover, PA, you passed not far from my house.

You don’t say what style of bridge this is for, but since I hand lay all my track, I find it very easy to make my own wood bridge ties from 8 x 8" (approx 3/32 in HO ) wood stock. I use diluted India Ink and 70% Isopropyl Alcohol to stain the ties. Rail is held in place using pliobond under the rail. Rail is heat treated with a hot soldering iron as it is gauged on the bridge. Here is a project I am working on now (Still needs the Guard Rails after the bridge is placed on the layout).

73