Copied from the local paper
.

That’s not me in the picture.
Happy Railroading
Bob
The Link To The Newspaper article was terminated by the paper so I’ve copied it for posting.
The City replaced water and sewer lines requiring CSX to redo the street crossing.

Replacing the rails TOP: Part of Kent Street in Winchester is closed to through traffic this week as CSX replaces old rails. CSX workers align a section of railroad track with heavy equipment at Kent and Piccadilly streets Monday. The project should be finished by Thursday. CENTER: CSX signal department employee Rick Long of Hedgesville, W.Va., shovels gravel from beneath a new 120-foot section of railroad track. BELOW: CSX employee Shane Pentoney of Berkeley
