Looks good for the most part. I have a couple concerns, but probably they are not biggies.
The grade to the lower level is pretty short, so I’m wondering if a) it is too steep, or b) there is not enough clearance between your benchwork and staging.
Even though it is possible to get cars into the service area via track 5, the maneuvers are pretty complicated and you may tire of it. What about connecting that service track to the loop in the lower left?
Content removed due to a completely fucked up and incompetent Kalmbach customer service.
Have you considered that you can split the rise and/or fall between the two paths? One track does not need to rise or fall all by itself. You can raise the upper tracks with a short grade, but rise only 2", while the one passing underneath can also dip for a bit and then rise again. It has been done.
Content removed due to a completely fucked up and incompetent Kalmbach customer service.
YOu can never have too much staging. You have room so add some tracks. I would come off the straight between 91 & 97 on the lower level you can get 2,3, or 4 more tracks.
Svein: How did you do what appears to be a three-way switch at the top of the wye?
P.S.: The lower righthand staging corner really looks space-saving efficient coming off of the track balloon in the lower lefthand corner.