Great day to run trains

I finally fixed my 4-6-0. I kept having problems with the lead truck derailing. I first tried weights with no luck. Then I spread the wheels out a little and it did the trick. ( I alos order a lead truck from Barry. When I got it in I will use that) Had the trains running all day without an accident. Eventually I want to weather my trains and have just short box cars and short logging cars with a logging caboose. (Logging RR) Winters projects. Here are some pictures of my bach running. Eventually my shots will get more realistic looking as things grow.

Shoester, From a short time you did a great job! Looks nice.

Show us the before and after of what you did on the front trucks. (it helps others)

Toad

Thanks toad. I still have a lot more to go. Still want to add some plants, I have a whole corner to work on, build some tunnel portals and I still have to add my side track off the switch. Thats going to be my logging operation/sawmill. Plus some structures like a mountain farm, cabin and a fire tower.

Cool Beans! I just saw your post over on the bachmann forums and was going to send you a PM here to see if you had any luck fixing the problem and saw this post lol [:D]

Toad is right though you have gotten alot done it short time, I dont even have any track down yet im still working on finishing up getting the roadbed down that I started in the fall! I need to stop messing around with the trains inside and get back to work outside now that it has warmed up [xx(]

Cant wait to see your setup more finished with the stuff you just said it already looks great!

Thanks, I did get a lot more done than I thought. Everything went smooth. Whenever I got to a part I though was going to take time ended being easy. My main goal was to get the track down and worry about planting latter. When I saw that under 4 bucks I could get Dwarf Spruce etc… I jumped on it. I ended up getting what I needed. I still have a lot of fine details to work on.