…I took a look on the internet and did find some. But I can’t post them here. I’m sure someone will.
Believe it or not. The LE&P RR is a tough one to track down.
Story of the genealogy of the Lake Erie & Pittsburg RR Co
Start here :http://www.s363.com/dkny/lsms.html
FTL:“…The LE&P was chartered April 30, 1903 to build a railroad from Youngstown, Ohio to Lorain, Ohio, 91 miles and a branch to Cleveland of 29 miles…”
Thence to the Lake Shore and Michigan Southern RR company:
linked: http://www.s363.com/dkny/lsms.html
Scroll down to the Cleveland Shortline RR Company:
FTL:"…The portion from Rockport, Ohio, to connection with the Lake Erie and Pittsburg Railway at Marcy, Ohio, 9.73 miles, was opened for operation on February 24, 1910, and the balance of the line, Marcy to Collinwood, 9.91 miles, on July 1, 1912. Capital stock all owned by The Lake Shore and Michigan Southern Railway Company.
Referencing the Lake Erie & Pittsburgh RR Company:
FTL:“…A contract was entered into on January 10, 1908, with The Lake Shore and Michigan Southern Railway Company and Pennsylvania Company, equal owners of the capital stock of The Lake Erie and Pittsburg Railway Company, giving those companies trackage rights over the Lake Erie and Pittsburg Railway…”
Clearly it mentions the Pennsylvania RR, but not the New York Central (?) until later.
The search engines return very little on the LE&P RR.
The LE&P was originally a 50/50 plan of the Big 4 and the PRR to access the port of Lorain. The LS&MS acquired the Big 4 interest after the construction totally mired down in the swamps near Berea.
The line from Marcy east was constructed to give the LS&MS a better route to Youngstown and points east (via the P&LE) instead of the route via Ashtabula. The line eventually served the NYC to run through traffic via the P&LE & Western Maryland to Baltimore & Philadelphia.
As constructed, the line was totally grade-separated Marcy to Brady Lake. The only open office was at Brandywine, about midway. From Brady Lake east the NYC used the PRR to Ravenna, then got on the joint B&O / PRR to Center St. Youngstown (or via the PRR from Niles Jct. to Center St.) and into the NYC Yard or direct to Gateway Yard on the P&LE.
The line was upgraded with a rail, tie, and surface job c. 1966-67. However, a landslide took out 2 spans of the Marcy (Mill Creek) double-track trestle in 1967. The trestle was rebuilt with new steel and concrete, and the line was promptly abandoned.
SHL
Thanks! Really appreciate the information.
I found very little on the Internet and it seemed to jump to P&LERR and even to ‘Search’ T&P. Was hoping a local would pick up the Thread and fill it out.
And also, Welcome! spvroprules [#welcome]
The New York Times - Aug. 14, 1904
Pittsburg, Penn. Aug. 13. - Another railroad, to be called the Lake Erie and Pittsburg, 140 miles long, connecting Pittsburg with Lorain, Ohio, and the lakes, and costing $16,000,000, will be operating both passenger and freight trains into Pittsburg in about sixteen months, according to the statement of John B. Carter, Vice President of the new road. Work has already been started, and before Winter shuts down, it is said, forty miles of the new roadbed from Lorain to Hudson, Ohio, will be completed. At Hudson it is proposed to connect with the Cleveland and Pittsburg Division of the Pennsylvania Lines.
Railway World - Feb. 3, 1905
President J. B. Carter, of the Lake Erie and Pittsburg, has announced that the road will be built from Lorain to Olmsted Falls, thence to Cleveland, where it will connect with the Newburg and South Shore, a road owned by the American Steel and Wire Company. From Cleveland the route is to Berea, Streetsboro, Shalersville, Freedom, Newton Falls. Mineral Ridge, Niles, Girard, Youngstown, Lowellville. A branch will be built from Youngstown to Warren.
Engineering World - May 15, 1906
Lake Erie & Pittsburg - The delay in constructing this line, which was originally projected to run from Cleveland to Youngstown, O., by William Kenefick and John B. Carter, has been caused by radical changes in location, to secure a 0.3 per cent grade for the entire line. Work Is to be started at once, and the entire line will be built by the Carter Construction Co., of which Mr. J. B. Carter and Mr. William Kenefick are the officers, with headquarters In the Traction Terminal Building, Indianapolis, Ind. Mr. Kenefick advises us that the line to be built immediately extends from Newburg to Kent, Ohio. There will be about 2,000,000 cu. yds. of steam shovel excavation and about 25,000 cu. yds. concrete work, together with
I have researched this railroad through parts of lorain County, and also parts of Cuyahoga County. The original route of the LE&P was to build to the port City of Lorain, Ohio on Lake Erie, and interchange with the Nickle Plate. A good portion of the grade still exsists in the county, some of it very visible. Also, in the Rocky River, as it flows through the town of Berea, are two stone bridge piers that were to carry the railroad over the river ( west branch). Marcy trestle, do not know if it is the original, is still in use by present day carrier C S X. This trestle towers over a Cuyahoga County MetroPark, and a portion of the long ago Erie Canal. The L E & P was to begin at Lorain, then head to and through the east side of North Ridgeville. My name is John Thompson, I live in Elyria, a city of Lorain County. My phone is 440-219-8777. Call me, lets talk railroads