Hello folks,
I always seem to do this…no pictures of the building. I have to take some this evening and post them. I have the right side of the structure roof to close in ,but not before laying the track.
Should be moving the whole structure tonight to its final resting place on a whole sheet of plywood. This building is massive in HO…4’ long X 4’ wide X 3’ high including the BOF vents.
Last night I added the safety signs around the doors.Photos to come later.
Patrick
Beaufort,SC
Dragon River Steel Corp {DRSC}