I am curious as to how long we run our trains continously at a time. Do our operating sessions last one hour or several hours? Do we stop the trains for a time to let motors in the locomotives cool off?
On my layout I have a single track main line with a couple of staging yards and two passing sidings, so no one train of mine runs more that 15 min during an operating session. I can and do sometimes have one train run continously for a while if I don’t feel like “operating” my railroad.
How do some of the rest of you do it?
overall