THANKS! That was knock down funny![(-D]
Petrex has an excellent video of a flood loader loading a coal train in the powder river basin. The train pulls through at a crawl. The flood loader has 2 bins, one loads the front, the next the back. It takes about 1 minute per car. The whole train takes about 2 hours. The car is also weighed in motion, before and after loading, and the bins are weighed before dumping. I don’t remember which mine was shown.