My evaluation team (2) has advised me that I have 8 burned out bulbs, This has been confirmed by the Quality Assurance group comprising of 4 + supervisor. An order for procurement must now bee generated and seent out to tender. This will be carried out by the logistics/procurement Dept comprising of 10. Once rec’d by shipping/recieving comprising of 5 individuals+ 2 Supervisors it will have to be forwarded through logistics,verified, Through the QA group then returned to Logistics and Procurement in order for them to arrange for a private contractor to carry out the acual work due in part that cost over runs have resulted in downsizing of certain work groups, namely the electricians.
However before a contractor can carry out said work he/she will have to be vetted by the HR dept comprising of 20 and evaluated/verified by the OSH advisors (3).
This period of darkness will last for about 2 months.
I believe this makes 54, but to be sure I’ll have to hire an independent consultanting firm