I try to work on mine daily. Even if it’s just to run some cars back and forth.
Nick
I try to work on mine daily. Even if it’s just to run some cars back and forth.
Nick
I try for daily - but that works out to approximately 2-3 times a week [swg]
i run mine for at least 1 hour a day- i work on it whenever i have the needed supplies- right now i’m out of cork roadbed and flextrack and i need a few more turnouts- since the mainline’s running i’m not real anxious to work on it it’ll probobly be January before i get more track and cork and get back to work
Too much schoolwork, I am at school for 11-14 hours a day until late next week.
I try to spend some time in the trainroom every day, even if it’s only a few minutes cleaning, or moving things around. Some days it is more fun to just talk with people here on the forums.
Never enough.
Last week was the first time in 3 months that I even looked at it
Gordon
About 3 or 4 times a week, they usually get a hour od two at a time. With 20 plus locos they are rotated on and off the track during the week. Some of them only get there every couple of weeks. I do a lot of armchair modeling here on the fourm as well every day.
I try to work on mine daily. I am still in the scenery building process, so I do more actual WORK than running trains at this point.
I basically work on my “stuff” whenever I have a spare few minutes. I have five extra minutes that is just enough time to get a few grabs ar a diaphram installed. I will designate blocks of time for modeling, but basically I just get to the bench whenever possible.
Usually daily to do something, lots of scenery yet to be done, so I’m always busy with that, Lately not much operation just work . It’s fun though.