Greeting fellow detailers! An installation question about ‘best practices’ installing diaphragms on F units.
I just purchased an Proto 1000 F3 AB set, along with a pair of Precision Scale diaphragms to connect the units.
The molded connecting doors look ‘capable’ of providing a mounting surface for the diaphragm,.
Here’s the question:
- Do I glue directly onto the existing door frame OR
- File down the molded door frame, and glue to the body
Opinions on both greatly appreciated along with suggestions. Thanks in advance.
JW in Ottawa, Canada