Layout Update 12-30-3011

Well most likely this is the last update for 2011. Today I made some progress and got Main Street roughed in and also finished the first building on the layout.

In the next two photos I have cut and fit the foam core street base.

In the following two photos the styrene has bee cut and fit.

Next I will cut and fit the sections inside the rail and then get it ready to paint and weather. As I add buildings I will place foam core bases and set the buildings on sidewalk sections. Also some photos of the first completed building on the layout .

What’s the cost of the foam core and how thick?

Foam core is cheap… couple bucks depending on the size. Styrene is expensive though… bought a 10 x 2 ft sheep or something like that. Can’t remember exactly how much but it isn’t cheap. The foam core is like 1/8 to 3/16 this something like that.

Corey

Who makes the electric meter on the side of the building, or was that scratched? Same with the awnings. Looks good.

Thanks Doug, no they came in the kit. This is one of those that comes with the four sides glued up ( wish they wouldn’t do that) and it comes with a bunch of plastic detail parts. They call them DPM - Pre Fab … but really they are just 4 sides glued up is all. Still have to paint it… put the roof on, details etc.

Corey