I am in the process of wiring my layout and had a few questions.
I have a modern (not the latest) ZW, and the Legacy Command System.
I have 3 independent loops that are connected by a crossover and a transition track from the lower level to the upper level.
-
When I ‘transfer’ a train from one track to the other do I need to worry about transitioning from one track supply to the other?
-
Would I be better off with rotary switches to select the power source? I would also think a SP switch to deaden the track block(s) would also be wise?
-
If using a rotary switch do I need one for each pole for each block? If not do I put the rotary switch on the common pole or the variable pole?
This was the configuration I was thinking…
ZW — 4 position rotary switch — SP lighted toggle switch