so now that you all have helped me adjust the layout, i thought maybe you can help with operations… below is my basic operation session plan and the layout design is at the bottom… thanks!!!
trains:
csx transfer: drop ~16 hoppers from wva staging at newell… drop ~16 empties from newell at wva staging
ple transfer: drop ~16 hoppers from newell at pittsburgh staging… drop ~16 empties from wva staging at newell
requires: 32 csx hoppers, 1 csx gp38-2s, 1 ple gp38-2
ple local coal: take ~8 empties from steel mill, load, and return (always have 8 full at mill) RUNS 2x
requires: 16 ple hoppers, 1 ple gp38-2
ple finished goods train: take ~5 gondolas with coils from mill (5 gons always at mill) and ~3 empty scrap gons from mill (3
gons always at mill), pick up ~4 tank cars from welland chemical (4 tank cars always at welland), drop 3 empty scraps at assad
scrap, drop coils and tanks at wva staging… return with 5 empty coil gondolas and 4 tank cars, pick up 3 full scrap gondolas
RUNS 2x
requires: 15 coil gondolas (csx, ple conrail), 9 scrap gondolas (csx, ple, conrail), 12 tank cars (welx, gatx, utlx), 1 ple
gp38-2
ple mill switching duty: constant sorting of loads/empties of coal, ore, scrap, finished steel
requires: 8 ore cars, 1 ple sw1500
ple newell yard switching duty: keep csx transfer moving, set up ple finished goods train including getting tank cars from
welland chemical
requires: 1 ple sw1500
schedule:
ple mill switch duty: build ple finished goods train
ple finished goods train: leave newell and head to mill
ple newell yard train: build tank consist for finished goods train
ple mill switch duty: build ple local coal
ple local coal: leave newell and head to mill
csx transfer: head to newell
ple transf