Lift out bridge

This how I did my bridge.

Step 1 Location selection.

Step 2 The bridge, made of Oak and Adler wood with Redwood trim.

Step 3 Wiring, I used Split Jaw overjointer clamps on the stationary track and half sections of rail joiners. then raised the ends about 1/16th inch. The rail on the bridge flots on the jointers, both ends of the are wired and Switch installed as a seperate block when in the off position that section is dead.

Left side

Right side

O&A Bridge installed

So far I have not had any problems with setup.

Dave

Hi Dave That looks great now I know how to do mine with split jaw clamps[:)]

Thank’s , Glad I could help, don’t forget to bury your feed wires, I used a 10ft section of PVC and 4 90deg el’s and add some extra wires for expanchion.

Dave