Mill split into two, with photos.

I added a wall, inside floor & ramp onto the shed of the Walthers Mill to make two buildings.

I still have some finish work to do.

Related links:

http://cs.trains.com/forums/3/1405737/ShowPost.aspx#1405737

http://cs.trains.com/forums/3/1378506/ShowPost.aspx#1378506

http://cs.trains.com/TRC/CS/forums/1315698/ShowPost.aspx

http://cs.trains.com/TRC/CS/forums/1348379/ShowPost.aspx

My new layout, (#4), a bridge-line that takes place in Eastern Missouri, will connect the CB&Q near hiway 79, then west to Hawk Point then south along hiway 47 across the old Wabash / Norfolk & Western RR line near Warrenton thru Missouri Wine Country to connect with MKT near hiway 94. Since this is “my” railroad most places will have the “flavor” of this area but maynot be perfect to the prototype. Time will be pre Burlington Northern (1970).

The things that will be different on this layout: