N. Y. Citiy Subway work, B,C, 72nd st. 86th St. STa., Myrtle Avenue Completed, L-line shutdown meetings

Deleted post since corrected post is below. Thank you.

Dave, Your entire post is cut off on the right side. Could you reformat so we can see all of the text?

Ag\in, the corrected postin is below.

I had done just that before posting it. Spent about 45 minutes of my time doing it.

It looked fine in the window when I posted it. Apparenlty, thorugh some quirk of the internet, like New York’s MTA not wishing their messages to be altered in any way, the posting actually reformatted itself to present the problem I spent my time trying to correct.

(You remember one time I posted a news item and Metro Norh switched it to a blurb from Gov, Cuomo!)

Please go to New York State MTA to read the whole message. I cannot correct the problem without the edit button. And some of the news was posted as news on this Forum,

Trying a new technique. Hope it works well:


MTA NYC Transit to Perform Subway Station
Repairs
and Improvements at 34 St-Penn Station on
1 2 3 A C E Lines
Penn Station LIRR-Subway Complex Will Remain Open
, Service Unaffected
During Project


Worked this time. Hope it stays that way!