New Project for The Broadway Lion

http://www.silive.com/news/index.ssf/2013/04/savino_no_extension_of_7_line.html#incart_river

So How about an extenstion of the route of the Broadway Lion from South Ferry Under the harbor to connect with the St George Terminal thereby replacing the slow ferry with a fast subway.