I haven’t done much lately, because it’s been so hot up in the train room. But in the cool moments I’m working on a team track.
Here’s the area as first done. The near stub track (covered hoppers) was originally the interchange track.
After I started operating, some deficiencies in my original track plan became evident. A few track alerations allowed me to move the interchange track to the curved track (brown ballast). So I made the old interchange track a team track. I also replaced the poster board paving with styrene.
I still need to weather the paving, add some vehicles and people and other detailing.
Nick