Well… from the last post the old layout is GONE! What took me over 2and 1/2 years to reach the tear down phase , it took 2 evenings to COMPLETELY remove from the house. Salvaged all of the track, and a bunch of the scenery materiels. Even managed to save some ballest. Packed away all buildings and cars. Have used the display shelf for all locos. Its powered by the way. Next step is to tackle the garage so I can start the new layout. Enjoying planning more than I thought I would.
As for tearing down I found myself at the point of not wanting to work on it cause Ive learned soooooooo much in the past 2 years that knowing that I did this and that wrong that I was done with it.
Got a space that has a bunch of potential for a great layout. Shelf type around the walls with a duckunder that will basically cut the garage in half. Well that is where this mans at with the mrring. Having too much fun…
Will post pics of before and after along with construction updates.
J.W…pirate for hire