Opinion on max grade for hidden staging

Yes, that’s definitely a more viable situation now, both for grades and access.

a vertical clearance of 3" does not seem enough; 6" would be better in case of underground problems.

BTW this solution is spot on!! Bravo. (if the run of the route along the wall also is 27 ft long, not counting the station close to the lower wall)

Smile

Paul