Based on some good inputs I made the following changes and starting construction of the benchwork, backdrop, lighting (infrastructure stuff)
-
Decided to scenic both “Staging/holding” areas to provide more operation. I dug out my KATY system time table for the trains running this portion of the two divisions - 2 running north and 3 south.
-
Extended La Grange to accomodate the bridge (La Grange has a similar bridge). And I am still working on positioning the bridge - including working a drawing for the construction below. I have it in my mind now to build this portion offline - like a diorama - and then insert into the layout. More coming this item
-
Placed correct sized structures on the plan based on my existing “stash” [:D]
Original plan below had too many staging tracks on the ends and several switchbacks were used.