I have over the years had several HO layouts, earlier ones survived for a time, later ones did not last or see completion due to outside influences. Have just set up metal benchwork in half a 40 foot ship container for my new layout. The basic benchwork area is a central control area with duck under access with baseboard area roughly 20 ft long 8 foot wide and bench width being around 25 inches, except the ends which are about 32 inches. It will be in HO scale, with several elevations. Lowest elevation I’m thinking at least one continuos running loop, hopefully two in HO with several yards. Second elevation at least one continuous loop, third elevation I would like two shortlines in narrow gauge, one side in mountainous scenics as a timber operation, the other side a desert scene mining operation.
But the more I try to learn of HO narrow gauge, the more confused I get. HOn3, HOn2 1/2,HOe and HO 9mm. The principal defining factor is going to be that which runs on N scale track, with every other sleeper removed. Simply because of availability here in Australia.
Has anybody got any suggestions,thoughts whatever on this, particularly the narrow gauge aspects.
Thanks