Hello all
I have heard about portable modular layouts and wonder how the track is connected accross a split in tables. Is the track just pulled apart and pushed back together or is there a special coupling available to make it easy.
Wouldn’t track couplings be damaged if just the little metal clips are used.
I can see where getting more than one connection together would be a pain in the ear. It may cause the track to be damaged in the process or at least pulled from the base. I have to get both pieces of track started and wiggle them together. Or am I doing it wrong?
What about people talking about a hindged folding table? How the heck does that work?
Just a newbe asking those dumb questions[banghead]
73 de Frank