I’m planning for the wiring of power for my FasTrack Christmas layout which has over a dozen switches, a couple of uncouplers, an operating track, and two accessories. The layout will be only TMCC and will operate 3 or 4 trains. I plan to use the modern version ZW with (4) 180W Powerhouses for track power (divided into 4 sections with the middle rail insulated between sections).
I have a postwar ZW which I hope to be able to use for the switches, uncouplers, operating track, and accessories. I plan to use my existing ASC’s to control the switches, my existing SC-2 to control the uncouplers and accessories, and an existing OTC to control the operating track.
I assume that I can hook all the above to separate controls on my postwar ZW without problems, but I may be incorrect. I plan to use the A-U for the ASC’s, the D-U for the SC-2 and either the B-U or C-U for the OTC. Even though there is a common ground, I assume that the A, B, C, and D handles will separately control the devices attached to them.
Can anyone confirm or correct my plans?