Hi everyone,
I apologize for the post, I know this subject comes up often but there are a few things I want to clarify before I proceed. To begin, I am going to power the switch machines using an MRC tech ll using DC power, I like this because it is seperate from my digitrax zephyr and will make trouble shooting easier.
-
Can I power all of the switch machine from one bus coming out of the tech ll? I think the answer is yes but I want make to make sure.
-
Is it possible to power the frog and move the points from one switch? I think I am going to have to use one DPDT switch to move the points and one SPDT switch to power the frog.
-
What gauge wire should I use for the bus and fro connecting the tortoise?
FWIW, I am using Atlas N scale code 55 turnouts.
Thanks,
Sean