Doing a lot of homework before I plunk down who knows how much $$ for about 120’ + of track, switches, turnouts, etc. Right now I am planning on using Atlas-O 3 rail track.
Read some non-flattering stuff about their switches (http://www.welchpoint.com/atlas/) and I am wondering if people are still having these issues with these switches - or has Atlas fixed them?
Thanks
ScottQ