I am starting a new layout but am switching from code 100 to code 83. The main difference I’ve noticed is code 83 does not have any nail holes in the ties. Just wondering how I should secure the track down. The layout is on plywood with a cork roadbed.
I used chualk to “glue” mine Atlas Code 83 to the cork and plywood. Just enought to hold it down (about equal to a thin coat of paint and you should be able to see the cork through th chaulk). You can run trains in 20 minutes, has a work time of about 5 minutes and easy to re do.
This is getting to be a very popular way these days.