Well, school has started, and they dont name it the Fall semester for nothing. I thought I might be able to start the discussion for once, and I have an update to go with it. After sitting on my camera for 3 months, The pictures have finally seen the light. I give you the Bradley Woodard Timber Company. Please note that all three modules are plastered, and also crated, so updated pictures are not possible.
First, an overall shot
!(http://i936.photobucket.com/albums/ad204/IVRW/The Irvine Valley Railway/The Bradley-Woodard Timber Company/100_5180.jpg)]
To give you a better idea of a trackplan, here are some module by module photos.
Module 1: The closest track goes to the rest of the railroad, and the highest track is the switchback tail
!(http://i936.photobucket.com/albums/ad204/IVRW/The Irvine Valley Railway/The Bradley-Woodard Timber Company/100_5198.jpg)
Module 2: The closest track goes to the loading area of Camp 2, the next two tracks are the Camp 2 runaround, and the last two tracks are part of the switchback to Camp 3
!(http://i936.photobucket.com/albums/ad204/IVRW/The Irvine Valley Railway/The Bradley-Woodard Timber Company/100_5201.jpg)
Module 3: The two closest tracks (hard to see) are the loading area of Camp 2, the middle track is the runaround tail, switchback tail, and mainline to Camp 4, and the last two tracks are Camp 3
!(http://i936.photobucket.com/albums/ad204/IVRW/The Irvine Valley Railway/The Bradley-Woodard Timber Company/100_5205.jpg)
Now for the most updated picture I have. This is of the switchback tail, which, of course, is now plastered. Look at the pictures on the Newspaper.