Even though I doubt any trains has traversed this route in a very long while, I wish to know if the rail and ties still exist along the route.
Naturally, the track would have to be refurbrished if not replaced and signalling would need to be updated. The article stated passenger service would be evaluated. If passenger service were to be initaited, that would imply the installation of PTC, driving up costs.
Does the original depot building in Buena Vista still stand? If so, does anyone know of its present use?
The track is extant. The welded rail is good (Union Pacific early on wanted to abandon the route and relay the rail elsewhere), but significant work otherwise would be necessary after nearly a quarter century of minimal attention.
What are the realistic odds of this track ever seeing a through train? Apparently in the original filing the expected annual revenues were less than $5 million. I wonder what the potential carload traffic is to get to the shortline rule of thumb of 100 carloads per mile of track?
Pueblo to Canon City - Tracks good - Tie replacement work about two years ago
Canon City to Parkdale - Tracks well maintained - used by Royal Gorge Route tourist operation and Martin Marietta stone trains form the Parkdale quarry
Parkdale west a few miles - car storage so track is passable
The rest of line west - rails in place, signals derelict and vandalized, rocks and boulders between the rails, brush etc. growing up
There is an old depot in a park in Buena Vista but I doubt it was the D & R G W
I just followed this line from Parksdale to Leadville on Google Maps. It looks like the line was built for a lot of traffic at one point? There’s quite a few long sidings and what looks like spurs for towns or mines that aren’t there anymore?
Isn’t this the line that runs through Leadville and hosts the Leadville, Colorado & Southern tourist railroad? I’ve ridden on that. The route is steep and winding going north out of Leadville. It’s hard to imagine heavy freight trains on that part of the line. When we were there about 10 years ago, it looked like the unused lines going south out of town were in pretty good shape.
DRGW Buena Vista contemporary brick Depot is long gone. (Parking Lot)…Colorado Midland wooden depot still there in the city park along US-24, used as a small CMRY museum. (Stuffed and mounted caboose on the north side)
Massive boulder (size of a large SUV) sitting on the track west of Wolcott, there is a CDOT construction caused slide to clean up near Edwards.
Track is in very good shape, except for the weeds. It was ready to run trains in 2008 (almost did/ as dark territory - Moffat Tunnel was near capacity.) Snow has knocked down the weeds. A ballast regulator or jordan spreader could clean things up pretty quick to get going.
You could run at 60 with passenger trains without signals and the the mountain geometry won’t allow over that in lots of places. Getting the signalled and gated crossings working will take some rehab effort)
There are going to be issues with local utilities placed (bootlegged) since the line was mothballed.
The Climax line has 1/2+ mile of the connection missing at the connection in Leadville, but that really isn’t UP’s problem.
There remains an issue with a crossing for a development near Edwards, been to court once. Needs to go to federal court to resolve.
The dollar figures posted earlier in the thread are way off, just somebody’s WAG on the high side.
The political knuckleheads in Salida are already trying to monkeywrench the process. (some skeletons in the town and county closet will certainly fall out)
Murphy: Not the same line. C&SN/LC&S connected at Leadville over US-24. Removed forcibly by CDOT (rough x-ing beaten to death by overloaded trucks), but never abandoned. (not maintained after BN pulled-out, wasn’t DRGW owned or maintained - The Moly mine has been threatening to reopen, but never quite got going in a big way. Trucking small quantities only.)
Ran an awful lot of trains through that TP line in the 80’s from the MoP connection in Pueblo (my introduction to Tunnel Motors). After UP got control of the MoP and later the SP/DRGW, traffic fell off the table. DRGW was VERY good at hustling short fast trains through the rockies instead of around them. They competed hard with UP, ATSF, BN and SP as a bridge operator, depending on origin/destination.
Lots of old branches to hard mineral, coal, rock and gilsonite mines all through that country that played-out before 1960. (Look up the Monarch Branch that hauled hematite for CF&I until that operation quit in the 1980’s)
Thanks MC. I just took a long Google maps tour to places I’ve read about but never been to, like Minturn and Dotsero. I always forget how arid Colorado is until I look at satellite images.
Google Earth shows in addition to other problems noted, there are large rocks on the tracks south of Minturn near Belden. Also the Belden siding has rock slides, but mostly the siding is covered by a roadway in the old Gilman mine loading area.
The wife and I were in Colorado a couple of years ago and I explored the line somewhat.
The line south of Leadville does appear to be in decent condition…the rail is in place and no real vegetation growing between rails. The ballast and signals were still in place, giving a very strange vibe. Very sad.
We stayed in Saluda and walked around the site of the old yard. The line east toward Pueblo is in very good shape and was in use at that time.
The drive up to Leadville from Minturn was spectacular but I kept both hands on the wheel and eyes on the road. Would love to spend a day aroudn the tunnel area exploring.
If trains run on that line again, I will venture west from Indiana to watch.
I thought I read somewhere where the YouPee was running a speeder over the line a few times a years just to make sure the line doesn’t get cut as a through route.
high railed about every 8-10 weeks, largely for FRA purposes in case they had to open it up for any reason (keep the paper trail intact / note where 213 defects are - but do not necessarily remediate any exceptions found) - Second purpose was to keep the scofflaws at bay (primarilly utilities, drainage and road maintenance activity by the locals - but you also had the Christo (event art) freak show up in there)
why was this particular line chosen for reactivation? Which factors played an important role in pulling it out of hibernation? Are there some set of measures which are implemented to ensure a successful reopening/reactivation of a railway line?
I am researching about successfully reactivated railway tracks and trying to figure out the boundary conditions for such tracks (viz. inactive duration, track condition, route length, demand, reason for closure, etc) and measures implemented to ensure its reactivation and sustainable operations ahead. Any help or lead would be greatly appreciated!
Can’t see how this would be, in recent years, with the significant rock falls damaging the track and cutting the rail. I thought I’d also seen images of rail paved over at some road crossings around Minturn. Not sure on that…