Hello, All
I need some advice on terminal connections, but can’t upload the track layout plan I’m working on. I can email it to anyone interested. I would like some input as to where I should put the terminal connections. I have an idea as to where, but the more experienced here will know better than me.

Thanks, Ron

Some general rules about where to put feeder/terminal connections:

If the track will be buried (tunnel, hidden staging, etc) put a feeder to every section of track

If you have insulated frog switches, feed power to the track on both sides of the switch.

If you feed power to the switch itself, only feed at the point end of the switch.

Open, easily accessible track can have feeders every other section of track.