The Zepyhr’s timekeeping has been shot to shreds because of this and track work on BNSF in Iowa.

Yes it has, Vincent. Saw the same train pictured above with phase 1 heritage unit 156 and 116 in Mendota IL eastbound on Wednesday almost 6 hours late.

Is it any wonder that Amtrak has NOT been saying anything in quite some time regarding “On Time Performance”? …

“[the work] is scheduled for completion on May 28.”

Hmmm . . . they must have beaten the deadline by a day or so. On Sunday, May 25th we were at East Portal shortly after noon to watch the westbound Zephyr crawl into the tunnel.

I took the CZ out of Denver on the 9th and am happy to have missed the detour. I’ve done it once, and that was plenty. We did follow a track inspector in a high-railer through the Gore Canyon. Arrival in Sacramento was a half-hour early.

I took the CZ out of Denver on the 9th and am happy to have missed the detour. I’ve done it once, and that was plenty. We did follow a track inspector in a high-railer through the Gore Canyon. Arrival in Sacramento was a half-hour early.

We were on No.6 on May 11 coming home from Glenwood. Stopped in Gore Canyon by a boulder between the rails. We had to make a reverse move to Azure and wait while they brought a boom truck from Kremmling. They found a second boulder on the way in. We lost about four hours.

We were on No.6 on May 11 coming home from Glenwood. Stopped in Gore Canyon by a boulder between the rails. We had to make a reverse move to Azure and wait while they brought a boom truck from Kremmling. They found a second boulder on the way in. We lost about four hours.