a video with a chalenger :
And video made by a friend of the layout in exibition :
http://www.youtube.com/watch?feature=player_embedded&v=UfQ-Bt9HOjI
a video with a chalenger :
And video made by a friend of the layout in exibition :
http://www.youtube.com/watch?feature=player_embedded&v=UfQ-Bt9HOjI
I wanted fo my layout a B-double raod train truck. like that :
But i didn’t found it on the market, so a decided to built one. The base is a kit kit of skelton container trail from deluxe innovation sell by 2 and a standard 48 trailer.
I needed to modify the tadem drive trucks into a Tridem :
The leading trailer frame have been modified to install a scratch built plasticard coupler on the tridem :
The tractor is a ford from GHQ white metal line :
All the length and axle spread are scale reduiced of conform to US legal specications :
The frame work :
Bonjour, Great work !!! [Y] [bow] [bow]
Cheers, the Bear.
Hello all !!
Here is a video showing the athearn challenger equipped with a tsunami decoder :
http://www.youtube.com/watch?v=0CMFh4jbm8A&feature=share&list=UUdiu8Syl5wuLnXd59tBtiqA
You can see on this film a part of the extention with the yard and the briges scene :
Here is the frame :
The briges scene under construction :
The water fall :
All the briges aboutments are plasticart scratchbuilt :
Wow.
Hello All,
I have on my extension a diamont crossing witch was not so smooth to run. The problem was that the atlas Straith 60° crossing was not the best way to give the right curve :
So i have made a complete revamping of the track of this area:
The hart of the project was to built a diamond crossing in double-curve with the correct 52° that i need :
Very hard to do in N scale 4 days of hard job 8 hours per day …
Here is the test video of new tracks, it was lot of work but i think it look better now :
[flash(425,350)]http://youtube.com/v/Te6POB2B69w[/flash]
The video link dont work sorry … here it is :
http://www.youtube.com/watch?v=Te6POB2B69w&feature=share&list=UUdiu8Syl5wuLnXd59tBtiqA
Hello all,
Here is some views of the realisation of a removabe dumpser truck.
The dumpster is in plasticard with some brass rods.
The truck is modified to with brass tubes, rods and sterene strips :
Hi all !! [:)]
Here is a all new video on my layout. I wanted to realise a HD video of the California Zephyr Kato on my layout. Here it is, i hope you will enjoy it :
Wow, it’s been a long time for a new update! You have an excellent layout and are an incredible modeller! I look at some of your work and I have to keep reminding myself that it’s N scale. I hope you will keep sharing your progress more often with us!
Wow, excellent work Bubule!
Fantastic work Jean. I hope my new build will look as beautiful as what you have shown all of us on the Forum. You have given me a benchmark to progress too. Wow! Doug
[:-^]
Hi Jean,
Very impressive modelling. I’ve really enjoyed all your pics and videos especially the CZ, wonder why ?
Your attention to detail is amazing and the work you did inside the truck terminal is fantastic especially when you realize it is in “N” scale. Then your rock mold work is real eye candy…
Keep up the great work and make yourself a regular here , I look forward to your further postings.
Johnboy out… Long live the CZ… also glad to see you have some Western Pacific power on your layout.
Many thank’s for the nice comments ! [:$]
hello !
Here is my lastest work : A F40PH D&RGW on a Call train kato base :
I have not found the correct “Ski Train” side logo, so i put smaller one. It does not have great importance for me. [8-|]
Here is the diesel in action : Pulling the Ski Train on the Turtle Field
Hello all ! [<:o)]
Here is a new video staring double stack Kato & Deluxe Innovation :
Hello all, so many thank’s to you guys !!
I have bring back my tools in hands this week and i have stared a new project. It’s a factory to fit the zone of the double briges.
The factory is full scratchbilt in 1mm thick carboard. The protoype that have inspired me is the Gates Rubber Co. in denver.
Of course my version will be much smaller, and have a quite different shape !!
Here is the first piece cuted since 1 year :eek::
This piece have been fitted with doors and windows from Ticchy train group.
Metal boarning is from evergreen :
Here is the inside view of the building, Corners are reinforced with sqare wood parts :
Here is the building fully putted toger, ready for paint job :
To be continued, see you soon folks !
Here is the first building of Gates Rubber factory painted and weathered :
Here is the prototype witch inpire me :