Has any one else built and are running unit trains? I am finishing building my 23 car N scale rock train. I am using two bay fifty ton capacity hoppers, most of which are of the peaked end variety. Any unit train that you have I would like to hear from you.
I have 11 of the old Tyco/Mantua operating clamshell door hoppers. I usually run them as a unit train, even though that’s not really a lot of cars. It’s the right size train for my layout, though.
It doesn’t really fit my normal modeling focus, but I have a DM&IR ore train that I like to run at the club for open houses, and occasionally just when I feel like it. Setting it up gets to be a chore, though.
I have the equipment for a couple (albeit layout length - read short) unit Intermodal (Well cars and Spine cars) trains, and a decent sized unit coal drag. (NS Hoppers)
I’m working towards a layout sized unit tank train as well, but am not quite there yet…
Two identical unit trains, one loaded, one empty, Tomikawa Tani Tetsudo six and seven axle articulated hoppers with a four axle brake van on each end.
Identical numbers on one side, a different set of identical numbers on the other side. The track arrangement that allows an empties in/loads out at the colliery is, schematically, a wye, so the opposite side of the train shows up every other cycle. When they meet on visible track each has different numbers.
These are short trains, not Powder River monsters; sized to match the prototype trains and siding lengths I recorded in Japan over half a century ago. The cars are all kitbashes of no acknowledged parentage.
A solid coal drag on my layout. 34 hopper cars with loads. AHM Berkshire on point. Its my only really long train, it far exceeds the lenght of my passing sidings.
Just a reminder that a ‘unit train’ isn’t just a train where all the cars happen to be the same type. Unit train means the cars in the train are treated as one unit - they’re hauled empty to a site to pick up say coal, then returned and unloaded as a unit at a power plant, usually with a loading/unloading balloon track at each end. There normally is no individual switching of cars in and out of train. 50 BN bathtub gons going back and forth together from the Powder River Basin to a power plant and back is a unit train; 50 refrigerator cars from various owners / lessors going from Los Angeles to Chicago on a Santa Fe reefer express isn’t.