UP Dix, Nebraska, Derailment Cleanup 2 Mar 2025

Union Pacific employed Mainline Services to assist in clean up of February 9, 2025 derailment and small fire of intermodal train Brooklyn Yard, Oregon, to Global 2, Chicago, IL, train Z BRG2B. Train piled up at control point CP W 437 Owasco west of Dix, Nebraska. Photo shows crossovers and mains 1 and 2 reconstruction. Main 3 was open. Photo taken March 2, 2025.

1 Like

What was the cause of the derailment?

Cause of derailment under investigation - nothing released as of March 2025.

1 Like

Ok, Keep me updated please @COZephyr1

It is highly likely that nothing will ever be released to the public. I will be shown in internal company reports but never released to the public.

2 Likes

This will be a WAG on the cause either a bearing failure or wheel broke and picked the switch and played sling it all over the place.

1 Like

It happened at a control point, as did a derailment of a grain train east of North Platte the same day. Both areas were experiencing bitter cold temps. It could also be a rail defect at an insulated joint.

Jeff

1 Like