Walthers new river mining

Hi,

I have a question about the Walthers new river mining company. How many carloads would such a mine typically load in a day? What would be the minimum and maximum capacity?

Also, would such a site be able to have it’s own small switcher?

And the last question. Have anyone tried to combine it with the Glacier gravel company? I have both and I have considered adding the gravel company structures to the New river structures. Any ideas about that? Do they match and what is your general feeling towards that?

Magnus

There’s a 5 page long thread about this Mine

it may have some of your answers

http://www.trains.com/TRC/CS/forums/803705/ShowPost.aspx