The C&A Ry is pushing westward, laying track out to the mountains. The new outer loop expansion adds about 100 feet to the outer mainline. It loops back on itself through two tunnels and a stone bridge. It will be utilizing 10 foot diameter curves, 2.5% grades with painted Aristo stainless. There will also be new sidings for a logging camp and coal mine.
This tunnel already has its portals installed. The were made from cut pieces of slate mounted to hardibacker board.
While working, I had the Dunkirk out for a run pulling a load of coal.
It was breaking in a new battery for its trailer car RC system (RCS Basic 2 system). The battery is a 14.4v, 3.6Ah, subC NiMH pack designed for the Roomba Robot floor cleaner.
I purchased for $37 with free shipping from - http://www.all-battery.com/index.asp?PageAction=VIEWCATS&Category=279 .
After almost 5 hours of running non stop, the Dunkirk showed no signs of slowing down.
-Brian