Beautiful work!
I have been working on my HO ceiling layout almost from the day I moved into this apartment a year & a half ago. The main reason it’s taking so long is my fluctuating health; but add to that the waiting - waiting for adhesives to cure, paint to dry…and waiting for just that right thingy I found on eBay to finally show up!
The main yard shed, covering 5 tracks, has occupied most of that time, with a Meccano superstructure, 15 regular ladders, 5 Walthers Safety Cage ladders, 20 1.5V lights protected by Miniatronics brass shades, and two Peco inspection pits joined to make a 16" pit (96 scale feet approx.), side illuminated by 3 mm fiber optic filament.
I’m using Bachmann EZ track, and using a Microminiatures Points Indicator to illuminate yard switch positions on my control board. I’ll also be using a cctv camera program to coordinate camera coverage of the layout.
The whole thing is 7.5 feet off the floor (10-ft ceilings), with 75 feet of track; on bridge, one tunnel, & one trestle. I work on the layout with an 8-ft aluminum stepladder.
Here’s the link to my post on here: