Why is new equipment a million dollers a pop?

And on an A-Z route, would trips between B and Y, et al., increase or decrease the load factor up or down from 50%? I could see a 100% load factor D-M for instance or a 30% factor D-M for that matter. How does that work into the A-Z figure?