Hello:
I am new here and getting back into model railroading. I have a question on the product Smooth It. I am using it for a roadway throughout the layout. The layout is in N scale and I have determined that the width of the road would be 2 5/8 inches long. How would I determine how many feet 4oz of Smooth It will cover? Or should I just use the tape to cover the length of the road and not worry about doing sections? Just keep making batches and cover as much as possible as I go?
Thanks in advance!