Hello.
I recently moved from doubletrack mains to singletrack with passing sidings. In doing so, I also am adding a helix and second level. Both of these caused some major yard revisions to occur.
Here is the plan:

Track capacities are as follows:
(sorry about the giant font, for some reson only one line will resize)
YARD LEAD 5 *PLUS SWITCHER
TRACK 2-ARRIVAL/DEPARTURE 15
TRACK 3- 13
TRACK 4- 10
TRACK 5- 7
TRACK 6- CABIN 5
TRACK 7- LADDER- KEEP CLEAR
TRACK 8- RUNAROUND
TRACK 9- STORAGE/SUPPLIES 5
TRACK 10- OVERFLOW/RIP 6
TRACK 11- COACH STORAGE 3 *80 FT
TRACK 12- SUPPLY 5
A few notes about the diagram-
The black area at the top is the pantry (on the other side of the wall), which leaves a convienient alcove for my new helix.
The bottom is towards the middle of the room.
The piece of track that looks like an edited switch going West into the yard from the main to the A/D is not there, it was a goof. The overflow yard ladder switch is directly connected to this switch, and as a result, all yard body tracks are actually about 9" longer and all storage/overflow tracks and service tracks are shorter.
My turntable is a 14" scratchbuilt, not the 9" Atlas, so the centering and s



