Good morning from a sunny and warm Chicago where we got a few thunderstorms through yesterday that broke the big heat. Lost power at home for a few hours for the first time in years. Fortunately, I was out at a local pizza joint for a ‘church meeting’ during that time.
That’s quite a stringline, Buckeye.
Jim A, you sure take great photos of your work too.
Chief, when that teen is done with your second story windows, send him over… I have a few to paint too.
Got unpacked, Got caught up at the office, now to get ready for a show this weekend. THEN back to work on the train layout. WAHOO!!! Need to do some followup with MTH on some parts for a brewery, and to see if I can find a 1666 somewhere. A kind gentleman has been holding it for me. And get that layout going again. Nothing in the way now. Finally !!!
Jim, I don’t think I received your email. The box actually got full while I was gone, and just got it emptied. Please try again at dbaker@klassicspecialties.com
Nick - That looks fantastic. How long does it take for the planning/approval process. Have you started planning the layout yet? You may end up starting up a club with a room that size! Great job !!!
I hear thunder!!! OH, over Raleigh where all the concrete is. Only place that gets rain. [V] Took kid two hours to prime the 5 windows. Did good job. Final top coat tomorrow AM. Youth going to Washington next week. OOOO big thunder. Better put truck in garage. Lab just went under the bed. Been watering all morning and afternoon. Took kid to burgers for lunch after he finished priming. Surprised him. Good kid. Later Hope it rains!!!
BTW: see Pope says we are not true Churches. HUMMM
Had a rough night as far as sleep goes. Have lots to tackle over the next few days. I am still on call, so hopefully I will get the chance. I have a friend coming down to do some shooting next month and need to get some serious work on the layout done.
Brent, do yourself a favor and put in the light switches with the slide dimmer next to the switch that will allow you to lower the light for those “late night trips to the restroom”. We put them in the master bath and the bathroom in the hallway on the main level. This way, you don’t go blind at 2am.
Don, got a 1666, shure is a nice looking locomotive. It does need some lube, but I will wait till I get the rest of the wiring done. Anyway, good luck on your search.
Haven’t been posting much of late, although I have tried to visit regularly in an attempt to keep up with what’s happening. That’s a tuff job in itself. [B)]
Been busy with the “G” set-up, they are worse than “O”. [xx(] Would much rather be moving around plastic or styrofoam rocks instead of the real things. Got some rail clamps on order so I can get the track down and ballasted, unfortunately the top of the retaining wall isn’t exactly level so the ballast (chicken grit) will have to be used for leveling and glued down.
Well coffee break is over, back to the quarry. [:D]
Take care all and play safe.
P.S. As you can see it appears as if there is a bit of a graffiti problem. [(-D]
Don, Planning and approval took around 6 months. It can be a real pain over here but we were surprised how smoothly the process went. Only real stipulations were that the roof tile matched that of the existing house. It was also prefered that the two walls that are seen be Bradstone (artifical stone) again to match the existing house. Building Regulations (I think what you guys call “Code” (Extream Makeover has reached our shores[:)])) Chap has to come and inspect at certain points during the build. Gamesroom (not including garage)area is around 54 square meters.
Have started planning with my son. We are going with a 16" X 8" layout as a manageable size. Have to fit in the FIL’s pool table and Jukebox. Busy playing around with RR track. Layout plan is similar to the TM fastrack DVD plan at the moment. 072 loop with a 060 inside. Though we may add a extension for a turntable. RR track will make ordering the correct track easier as I can’t just pop out to the local stockest[:(].
Nick, How big is that building & how much will be layout. It looks very nice.
Doug, That is a nice outdoor layout. When you get done working and have the time give us a rundown on the track plan and more pictures.
Chief, How is the garden coming? We are getting tons of Zucchini, yellow squash, peppers, hot and mild & eggplant. We are between crops of tomatoes. The early are in a lull and the main crop hasn’t started yet.
Friend and I put up track lighting in the Church Library this morning. Older folk, older than I which makes them really old, were complaining that they could not read the book titles.
Working on 50th Class reunion year book which will have the graduation picture and a current picture + a small bio of the last 50 years. Try condensing 50 years into a paragraph sometime. We got 82 responses out of 103, not bad when you consider most of the others are deceased.