I am a new n scale modeler, smart on most things, I have been building & flying rc helis with great success for 4 years now.
But somehow, turnout politics, frogs, etc., still evade me! I’m very visual, so maybe I just need some hands on experience.
I guess overall the question for my situation is: can I get away with a reliable layout using code 55 track WITHOUT using power routing turnouts (all -live) thus avoiding the complicated wiring?
As of now, I have some beautiful benchwork made, elevations complete using the WS system, roadbed laid, and plenty of code 80 track ready to lay, including 15 Peco insulfrogs.
But after all the blood sweat & tears, somehow I cant bear to put all the effort forward without having a beautiful scale look that the code 55 provides. I’m under the impression that ANY code 55 arrangement REQUIRES complicated wiring, & use of tortoises to power turnouts (I’m using all manual throws & some humpyard purveyances)
Can someone walk me through it as SIMPLE as possible? like if I go code 55, what do I wire, where, & how. Any chance of straight turnout install, hookup a ground throw, and VOILA! I’m up & running? Instead of GAP, WIRE, GROUND, POINTS etc?
For simplicity sake, am I better off just accepting my gripes with code 80 & get to operating?
Man, I’m so good on scenery, planning, & aesthetics, but I am a WIRING DUMMARD!
Any help most appreciated guys, thank you
Lee