IHB to the rescue?

Fred Frailey’s TRAINS article on fixing Chicago made the point that a number of changes to through routings in recent years has had a significant impact on freight congestion in the Chicago area. He went on to highlight some problem areas e.g. 75th Street crossing where no money for a solution is in sight, and big money is needed. This got me thinking whether other routing changes might help alleviate such problems. There is the blue sky thinking of the Great Lakes Basin; other suggestions I have read include resurrection of the Kankakee Belt Line, TP&W etc. The response to such ideas seems generally to be negative- too costly, too difficult, doesn’t really solve any problems and so forth.
The thing that struck my eye on the TRAINS map was how the IHB circles the city, usually grade separated from the lines it crosses- as noted a good route for freight interchange. This led to the idea that the IHB might play a larger role. It is not based on any knowledge of costs, traffic flows, inter- company rivalries, and may be just as off beam as others which have been demolished. Please treat it accordingly, and correct any of the assumptions which are factually incorrect.
The IHB was the NYC access past Gibson Yard to Chicago connections, and it was indeed a major owner. However, the successor to the NYC, the NS, can no longer easily connect to the IHB, and there is no connection at all from the NKP (tricky location). You can get from Gibson Yard on to the NYC/NS main at CP 502, but this involves crossing the B&O/CSX main on the flat on a big U curve. Hardly a way to minimise congestion. There is still the connection at Porter IN from the former NY

Boy are you ever out of the loop. (bad Chicago pun intended)

(1) As we speak, NS and CSX are reworking the connections in Chicago to accomodate a bypass at the Gary Airport to extend the airport runways. Major activity at Tolleston, Clarke Junction/CP-501 and Gary/Millers*. (CSX/NYC Porter Sub to NS/WAB Gary Sub)- they’ve been at this for 3+ years

IHB/G&W Dune Park Branch is dead and gone - Abandoned officially after IHB gave up on it. (Still technically owned by PC Estate)…CSX just removed the IHB (G&W) bridge at Tolleston in December. Indiana DOT and Gary have made a mess of things for the railroads. InDOT should have been shot for killing off the PRR Ft Wayne main in the 1970’s (they even botched the ICC abandonment - typical clueless highway administrators, complete with a collapsing bridge)

I’ve missed what’s going on at Millers (or Miller or Miller Beach, depending). Help?

A couple of thing. 1st the NS has trackage rights over CSX from Porter to the IHB connectoin at Ivanhoe, and uses them. It still crosses the CSX at grade at Willow Creek. 2nd, the IHB does not own the railroad from Blue Island to McCook. It is owned and maintained by the B&OCT. It is a very congested piece of railroad between Blue Island Jct and 71st. It is one of CSX’s UPS routes into and out of Chicago. CSX is not going to permit additional connections to be built that would in turn impact its UPS traffic.

The actual point where ownership changes is known in the timetables as Superior, which is in the village of McCook, but is not the McCook crossing, as some might assume. This explains why a friend of mine, then a Chessie employee inspecting track on the B&OCT, was chased away from Pielet Brothers by guard dogs 'way back when.

What’s even more intriguing is that B&OCT was involved in a plan to extend the IHB beyond Franklin Park northeastward toward Mayfair, to interchange with the northern lines of CNW and MILW. I can’t remember whether the line was actually built or not, but it was shown on some maps, and grading was at least partially completed (a diagonal street known as Forest Preserve Drive covers about three miles of the intended route). This was B&OCT…I can find nothing connecting IHB to the venture.

IHB was part owned by MILW if that qualifies as a connection (never a a major owner, but)…was supposed to be part of Il-fated Chicago Milwaukee & Gary loop. (some survived as MILW’s Joliet Branch)

Millers on WAB falls between Aetna and Gary, just 200 yards west of where the G&W’s Dune Park Br. crossed over Wabash…not the same as CSS-Miller or B&O Miller which are about 1-2 miles east.

Half of the B&OCT R/W was owned and used by PRR predecessor SC&S (nominally the south main track) to get to various refineries. Through a confusing series of exchanges w/ B&OCT starting in 1913, B&O took control of the R/W. However, PRR still had rights on the B&OCT from Pine to Clark and on to the west. What is confusing (to me) is why and how PC/CR quit using the line. There is no docket to cover at the federal level (just like the issue with the PRR main from Clark to Whiting condemned by InDOT in 1978)

Carl: Gary to Millers connection all happens in a box confined between Massachusetts to Virginia, 9th[WAB] to 11th[NYC] …NS bulldozed the foundation of the old Millers depot just north of the sugar packaging plant (Indiana Sugars) at 9th & Virginia and blew a giant hole in the IHB/Gary & Western Dune Park Branch elevated fill. (only time I walked a main track with a machete and bank blade and still couldn’t walk between the rails in places - fortunately we never found a dead body in the thicket/jungle of abandoned G&W or PRR R/W.)

Hoping the OP understands that CN gobbled up most of IHB as its personal Chicago shortcut or he’s got a lot of learning to do. The Google Earth & Bing Imagery has yet to catch up with the changes in the SE quadrant of Gary.(and has CN ever been busy building railroad in this same area for their Chicago bypass)

I think that you mean CP has gobbled up most of the IHB capacity, Mudchicken.

Late to the discussion here and most of it is pretty accurate.

NS has several access routes to Gibson:

  1. NS - Porter Branch (CSX trackage rights) from Porter west. Currently there is a connection in place at Tolleston which allows trains off of the Porter Branch to access Kirk Yard. This was put into service the past few months and is NOT shown on the map in Trains. It is a critical omission to the map. Currently NS is running 2- 3 trains daily into Kirk via this connection. Also, NS is running their 31M auto racker to Gibson via this routing frequently. Westbound 31k is a Kankakee route BNSF train which uses this routing.

  2. NS can continue west on their mainline to CP 502 and make a left hand turn onto the IHB and access Gibson. They do this frequently with the 31M and 31k, based on what is occuring on the CSX.

  3. NS can access the Gibson Yard from the NKP line, turning right at Osborn and then moving up to IHB Gibson. This is done by their auto racker 13J from Ft. Wayne daily. For awhile earlier this year 13J was moving on the old CFE (ex PRR) from Ft. Wayne. This was a daily move until they figured out the CFE line needed a lot of work. Chatter earlier this year indicated NS was going to run 6-8 trains daily on the CFE. NOPE…cannot occur in the present conditions.

  4. NS can access Gibson from the Kankakee line, although I dont think there is anything moving that way.

Meanwhile the Kankakee line is an interesting route. Currently 10R, 31k, and 36J run this route as scheduled manifests. There are coal trains which move to Wheatfield, In from UP (Momence) and off the NS from somewhere out east. Usually there are 2 loaded coal trains per day to feed that hungry NIPSCO power plant. There are some grain trains which move via this line.

Interestingly, CP trains could access IHB (whom they have ownership in) as a route to Bensenville,

Many thanks for all these responses. My understanding of what is going on was clearly imperfect, and these responses bring some clarity, but the situation as described is complex, probably only truly intelligible to those who have to operate through it!

I should first of all say that the last time I was around Gibson yard, I shot NW2 8829 next to the coaling tower, an SD45 leading an EL TOFC train across the main street in Hammond and a Baldwin DR 6-6-2000 at Kirk Yard. Nixon was president, so yes, Mudchicken, definitely out of the loop.

Also, my downloaded N American RR Map, whilst invaluable in many respects is not always reliable, and certainly now out of date. This shows NS trackage rights on the Porter branch ending (very oddly) at Willow Creek. Now n0121944 says these extend to Ivanhoe, so my starting premise that NS can’t directly access the IHB from the NYC at Porter falls flat.

What I didn’t get from the Frailey article was why CP sends its Michigan traffic via Craigin and the BRC (see also MP173, point 4); I would have thought the IHB would have made more sense, and assumed, wrongly, the BRC routing was because of limited connections eastward off the IHB. It was said that one of the reasons CP was after CSX was to get control of the IHB, and I assumed (unnecessarily) they would have then fixed the eastern connection.

The bit I missed was BOCT ownership from Blue Island to McCook (n0129144 and CShaveRR) and its importance to CSX traffic. I thought CP had part ownership of all the I

Speculating, of course, but I believe that the main purpose of all this was to get congestion on the former NYC line out of Chicago under control, so the extent of any improvements to the NYC line that would deliver what was wanted, would have been enormous (extra main all the way to Elkhart?)

I also don’t believe that the former NKP line would have worked very well, since the west end between Fort Wayne and Chicago sees a good bit of use as part of NS’s Atlanta-Chicago corridor. So again, what extent would they have to go to with improvements to make the new use work in a way that doesn’t impact the existing?

Bottom line, I suspect that NS envisions this need as being temporary, and doing what they have done to bolster an underused property was likely cheaper than the other two alternatives. [2c]

Plus, no “enviro” delays, no Nimby concerns, just dress up what already exists, and run 'em.

Thanks- your conclusion sounds plausible to me.

Yes, but…[;)]

While short “ramp up” time and lower up-front costs are likely factors, one additional possibility came to me later after first posting the above.

Someone might know better, but it could possibly be that by perfoming the improvements on a line that is not owned, the related costs could be “expensed” and recovered more quickly than if they were capitalized on their own property, and amortized over several years?

IIRC, CFE is leased from CSX but NS has trackage rights on the former Pennsy raceway from the Conrail split deal. So NS upgrading CFE would be similar in a way to what CSX is doing with the L & I line between Louisville, KY and Indianapolis, IN.

NS set up a separate “fueling facility” on the ex PRR in downtown Fort Wayne so that traffic on the CF&E can run-through without having to go up and down the busy ex-Wabash line in town to get to the fuel pad at East Wayne Yard. So there is evidence NS hasn’t given up on the idea of running run-through trains on the ex PRR. NS still dispatches the line, too.

Details on the improvements to the former PRR line, if any one is interested:

http://www.journalgazette.net/blog/the-scoop/Chicago--Fort-Wayne--Eastern-railroad-announces-track-improvement-project

I had thought some source had mentioned that the “6 train per day” limit for NS was being expanded as part consideration of the improvements they were funding. But I can find no hard evidence of that anywhere. So it must have been just hear-say?

I live in Valparaiso, In (NKP and CFE lines run thru town) and have been somewhat puzzled by the lack of NS trains on the CFE…until last Saturday.

CFE sent an eastbound freight with 2 units and 100 cars. Most of the cars were loaded boxcars, loaded grain hoppers, and loaded gons (scrap). The final 20 cars were BNSF empty rail carrying flats going back to Columbia City no doubt for more welded rail. Nice healthy train.

The train was moving at perhaps 10mph. I jumped ahead of it about 10 miles and waited and it was still moving 10mph.

The track looks good, but obviously there are issues. There was probably 11,000 tons with 2 big motors, and the engines were not working hard, so it wasnt a matter of an underpowered train.

NS doesnt seem to be moving freight between Ft. Wayne and Hobart on the CFE and it seems to be an issue of slow orders.

How this plays out in the future is something I cannot speculate on, but for now the grand plans of using the CFE as a relief valve for 6 trains daily doesnt seem to be reality.

Ed

Ed,

I would not be so quick to jump to the conclusion that the six eastward trains per day plan is dead.

The article announcing it came out in January. It says 50 miles of surfacing, 10,000 ties, and some rail relay. That is a summer’s worth of work for a shortline even if contracted. First do rail changeout assuming it also requires new tie plates. No sense to spike kill new ties. Then change out ties. Have to purchase them, get them and unload them before can even start to change them. A good shortline tie crew can do 500 ties per day if they get full day of track time. That is 20 work days, say a month. Surfacing will probably be at rate of about 1 mile per day, so there is another two months, although surfacing could start about a week after the tie project. Look for ballast trains after tie change but before surfacing. Do not know how much signal work would be required to get reliable predictors in the bungalos. Since this is former high speed line I would assume track circuits are already long enough.

Just because the train you saw was doing 10 MPH does not mean this work is not underway.

Mac McCulloch

The funny thing about that, here in Ft Wayne we are getting multiple eastbound unit tanker trains, DAILY coming in on that line from the west. I haven’t bothered to stop for an entire day just to monitor this line but I pass it several times per day and see new trains on it frequently. Invariably with consists made up of NS units combined with one of the two big western roads, followed by a buffer car, and then a long stream of tank cars. The varying make up of the consists along with the different buffer cars confirm that these are multiple trains per day and not just the same train sitting there all day. Just the other day I observed two fuel trucks sevicing a stopped train at the fueling stop.

Wonder where they are coming from if they are not going through Valpo?

edit: Are you getting multiple east bound tank unit trains per day on the NKP?

I suppose that it is possible that they are traveling Chicago-Ft Wayne on the NKP and then switching over to CFE at a local west side junction, to fuel and then continue east on the CFE.

Do NS and CSX have the big rail and/or tie replacment machines like UP & BNSF use? Similar to this?

https://www.youtube.com/watch?v=_MKcTbYDP7w

Multiple machines were in the video - Each carrier has machines to deal with it’s own track characteristics. Ballast spreading, Ballast Cleaning, Tamping, rail replacement and tie replacement are common to all railroads. The functions can be done individually or in concert with each other as the carrier may desire.

The 1st machine pictured was changing the right of way from wood ties to concrete ties - in most cases the machine is leased for the specific job the carrier desires as concrete ties have yet to become the universal replacment for wood ties. In most cases the installation of concrete ties covers a ‘test territory’ where the performance of the ties will be closely watched over time. While the theory is that concrete ties provide more consistent and longer lasting rail support than wood ties, the demonstrated performance has fallen short of the theory and the make of concrete ties is constantly evolving to remedy the shortcomings found in the test installations.

Mudchicken is the expert on this forum in the track work area.