I was wondering if it is possible or even a good/bad idea to run code 250 with 332 track? Any input would be great thanks, Barry
Yes, you can. Split Jaw make transition clamps to facilitate it - http://www.railclamp.com/displayCategory.jsp?categoryId=9&vId=73910
-Brian
Very good suggestion by Alt and would go that route. Make sure tops of rail and inside smooth after installing.
Toad
Ok, thanks guys.