Layout Build..... Construction Thread RR in CB

I will be just updating this thread from now on and giving an update from here. Here is an update with a couple more photos of Main Street… this time with the crossing section fitted. Now it’s ready to paint.

Here are the prior threads from beginning to end:

http://cs.trains.com/TRCCS/forums/t/196263.aspx

http://cs.trains.com/TRCCS/forums/t/198961.aspx

http://cs.trains.com/TRCCS/forums/t/200848.aspx

Update 1-8-2012

Spent the week working on Main St. I used several shades of grey to arrive at the mottled color of the street. It still needs to be weathered and striped. Also finished another building. I think I will be concreting in everything on the left side of the buildings as that will allow for a side street and a more interesting building arrangement.

Thanks for looking…