Layout Condition

Its a work in progress.
The vast majority of track work and electronics are complete and operable – and lots of fun !!
Time to get on with backdrop detailing and hard shell landscaping.

TOTALLY bored? Hmmm…[:0]

Lots of thinking and problem solving. Some track and trains set up on game table. I need to store equipment, dismantle game table and start on phase 2, benchwork designed specifically for my layout.[:)] GO PATRIOTS

A work in progress. 11 x 14, benchwork 80% done, track 5%, wiring 0%, scenery 0%, locos, rolling stock, structures, 150% and growing.

Almost “finish”. A bit more scenery to upgrade.

Maybe time to change scales? On30 looks real interesting lots of detail and some heft and you can re-use alot of your HO track, just an suggestion?

Hark!, an extra $100 came floating by and I grabbed it. I just ordered some turnouts and will be able to fini***he first full loop when the order arrives next week!! [:D]

Sounds like it won’t be long untill I will be able to actually run a train on my layout! [:O] it’s only taken a year!! [B)]

A reprieve!!

The yard stays[:D] but its a tight curve from the mines[^]and all down hill to boot[:-^]

Update on layout condition.
All the curves on my mainline are now at least 22". I was able to replace the 18" curve without too much damage to the rest of the layout.

Gordon

Track is mostly laid, trains are mostly detailed, the mountains are finally done, and I’ll get to finishing downtown someday… someday.

Phase one is complete phase two is started phase three is planned phase four is in planning and still waiting for that FFA (full Funding Authorization) Joe