Hi!
I’m building a new HO layout, postwar era with both steamers and 1st generation diesels.
On previous layouts, I’ve built an ash facility for a single track. On this one, I would like for one “tower” to take care of two adjacent tracks. Was this done in the real world?
I suspect it was, with perhaps a metal conveyer pulling ashes from the furthest track over to the tower and buckets. I just find it hard to believe that a large loco facility would have just one ash facility or multiple towers to handle each track. Obviously, I’m not sure of that and ask you help.